1 Opening(s)
6.0 Year(s) To 10.0 Year(s)
14.00 LPA TO 24.00 LPA
Job Purpose
We are looking for an experienced Substation Design Engineer for our Renewable Energy Projects (ISTS/Captive) with 6-10 years of experience. The candidate will be responsible for the design and engineering of EHV Substations up to 400kV for solar and wind projects. The role requires a strong background in substation electrical design, detailed engineering, and collaboration with cross-functional teams to ...
1 Opening(s)
8.0 Year(s) To 12.0 Year(s)
40.00 LPA TO 40.00 LPA
DC Design
Experience: 8-10 years
Qualification: B.E/B.Tech/M.E./M.Tech (Electrical)
Job Description:
Guide and manage team of design, project and site engineers
Preparation of Technical architecture based on the tender documents; Review of Bid documents like PPA, RFS, etc.
Conceptualize and develop technical specifications based on international codes and statutory guidelines for electrical design including Switchyard and Transmission Line up to ...
1 Opening(s)
8.0 Year(s) To 15.0 Year(s)
30.00 LPA TO 40.00 LPA
Electrical Power business (Power Generation, Conversion, Distribution and Control) is leading the way in the application of advanced technologies towards the development and delivery of high-performance power products for aerospace and industrial hybrid vehicle applications.
The ‘Advanced Lead Engineer – Electrical Component’ provides technical leadership, execution through domain expertise and leads ...
2 Opening(s)
8.0 Year(s) To 15.0 Year(s)
32.00 LPA TO 35.00 LPA
Job Description Summary
The Aviation Electrical Power business (Power Generation, Conversion, Distribution and Control) is leading the way in the application of advanced technologies towards the development and delivery of high-performance power products for aerospace and industrial hybrid vehicle applications.The ‘Staff Engineer – Electrical Component’ demonstrates technical and programs leadership, execution ...
2 Opening(s)
6.0 Year(s) To 8.0 Year(s)
8.00 LPA TO 9.00 LPA
JOB DESCRIPTION - Electrical Maintenance Engineer
Job Responsibility
Responsible for leading the Preparing schedule for Preventive maintenance & carrying out Preventive & Predictive maintenance of plant machine and Utilities.
Ensure that installations and applications are in line with customer needs and safety standards
Maintain the assets related to electrical and proper utilization.
Prepares and reviews engineering drawings, ...
1 Opening(s)
15.0 Year(s) To 20.0 Year(s)
50.00 LPA TO 55.00 LPA
Experience: 15+ years in EHV Substation & Transmission Lines- EHV Line CTU/ STU permission and approvals, compliance and regulatory management within the renewable energy sector
Mandatory areas of Domain Expertise.
Substation Engg. (AIS/GIS) 400kV, 220kV, 132kV, 66kV, 33kVa. In-depth knowledge of design and detailing of EHV system for Renewables Projects. (Solar PV/ Wind/ EHV Substation).b. Preliminary design, ...
1 Opening(s)
5.0 Year(s) To 8.0 Year(s)
14.00 LPA TO 14.00 LPA
Job Description Summary
Lead Engineer Accessories Instrumentation will leverage his or her engineering and leadership skills to develop design packages that relate to the upgrade or retrofit of gas or steam turbines and generator accessories. They will mainly focus on the design integration of electrical and instrumentation systems with control hardware ...
1 Opening(s)
5.0 Year(s) To 14.0 Year(s)
10.00 LPA TO 25.00 LPA
Role & responsibilities
WTG Procurement (tower, blades, generator, gearbox, and low- and high-speed shafts) & purchase of wtg BOP essentials for Wind Projects
Contracts negotiations and management (Negotiation for Cost, Delivery, Warranty, Terms & conditions.)
Vendor management
CAPEX and Raw Material procurement Management
Budgeting & MIS and Reporting
▶ Spearheading the procurement of electrical components for wind turbines, ...
1 Opening(s)
8.0 Year(s) To 10.0 Year(s)
15.00 LPA TO 15.00 LPA
Electrical Engineer- Quality (SQA+FQA)
Experience: 8 – 10 years
Qualification: B.E/B.Tech (EEE)
Job Description:
Preparation of Pre-Bid Quality Requirements of Suppliers and Contractors.
Review of Pre bid information and provide joint Technical Evaluation Rating (TER) along with design. Communicate rating and order preference along with PO conditions if any to SCM team.
Preparation of SOP’s, Quality Manual, Formats and ...
3 Opening(s)
8.0 Year(s) To 12.0 Year(s)
8.00 LPA TO 14.00 LPA
Electrical Eng - AC/ DC + MV cable laying, ICOG/ IDT Erection + 33 kV TL Execution, Stringing (Good to have outside boundary experience & 120 kV + TL experience)
Job description
Supervising and verifying preventive maintenance as per schedule for solar power plant equipment's e.g. Modules, Inverters.
Checking inverters and Strings for ...