19 Job openings found

2 Opening(s)
12.0 Year(s) To 18.0 Year(s)
17.00 LPA TO 17.00 LPA
Elect Lead - AC/ DC + MV cable laying, ICOG/ IDT Erection + 33 kV TL Execution, Stringing + Outside boundary experience, Substation experience, 120 kV, 220 kV, 400 kV TL execution, Tower & Transmission line erection Job description This position exists to lead, manage, and support development of solar business in ...
1 Opening(s)
6.0 Year(s) To 10.0 Year(s)
14.00 LPA TO 24.00 LPA
Job Purpose We are looking for an experienced Substation Design Engineer for our Renewable Energy Projects (ISTS/Captive) with 6-10 years of experience. The candidate will be responsible for the design and engineering of EHV Substations up to 400kV for solar and wind projects. The role requires a strong background in substation electrical design, detailed engineering, and collaboration with cross-functional teams to ...
1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
21.00 LPA TO 22.00 LPA
Project Manager is responsible for the development, implementation, and coordination of solar energy systems. Their role is critical to ensuring that projects are completed safely, efficiently, and on time, while meeting quality standards and budget constraints.  Here are some of the responsibilities of a solar project manager:  Planning: Create project schedules and budgets, and track ...
1 Opening(s)
8.0 Year(s) To 10.0 Year(s)
15.00 LPA TO 20.00 LPA
Responsibilities & Duties:  Planning, budgeting and MIS on regular basis  Procurement activities for services and materials  To study civil design drawings, design optimization, BOQ  To identify contractors for foundations, control rooms, precast boundary walls, fencing walls, road construction, ground levelling, land development and various other civil works  Hiring of JCB, ...
1 Opening(s)
15.0 Year(s) To 20.0 Year(s)
25.00 LPA TO 30.00 LPA
The Procurement Manager will be responsible for overseeing procurement activities for Balance of Plant (BoP) ofWind projects, with a specific focus on Contract Management. The role involves ensuring timely and cost-effectiveprocurement, managing vendor contracts, and maintaining strong relationships with key vendors while handlingfinancial aspects related to payments. Procurement Strategy Development: Develop ...
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
15.00 LPA TO 15.00 LPA
Project Product Electrical Engineer Location: Chennai Band: Professional Business: Solar & Storage Solution Exp: 5+ yrs Education: Engineering Degree in EEE or Electrical is must.( Avoid Diploma or Part time Education), MTech preferred. Role – Individual Contributor Travel to Plant – 10-15% Who We Are Solar and Storage Solutions provides reliable, affordable and dispatchable integration of renewable energies. The business ...
2 Opening(s)
10.0 Year(s) To 20.0 Year(s)
14.00 LPA TO 24.00 LPA
Civil Lead - Boundary survey, Fencing work, Grading, Levelling, Piling & ICR, 33 kV TL foundation work + Substation and Bay area foundation, 120 kV + foundation experience PRINCIPAL ACCOUNTABILITIES Accountabilities Major Activities Drive the qualification of identified new business opportunities in the solar power projects and solar dominated wind -solar hybrid ...
1 Opening(s)
6.0 Year(s) To 10.0 Year(s)
14.00 LPA TO 24.00 LPA
Job Purpose We are looking for Design Civil Lead for Renewables project (Solar & Wind) who has expertise in Design & Engineering of civil & structural works (experience of 10 – 14 yrs. in Solar/Wind/ ISTS projects) Key Responsibilities Accountability Supporting Actions Leadership Team Management  Lead and mentor a team of civil engineers, providing guidance and fostering ...
2 Opening(s)
6.0 Year(s) To 20.0 Year(s)
15.00 LPA TO 40.00 LPA
Project Manager is responsible for the development, implementation, and coordination of solar energy systems. Their role is critical to ensuring that projects are completed safely, efficiently, and on time, while meeting quality standards and budget constraints.  Here are some of the responsibilities of a solar project manager:  Planning: Create project schedules and budgets, and track ...
1 Opening(s)
10.0 Year(s) To 20.0 Year(s)
40.00 LPA TO 40.00 LPA
Project Manager is responsible for the development, implementation, and coordination of solar energy systems. Their role is critical to ensuring that projects are completed safely, efficiently, and on time, while meeting quality standards and budget constraints.  Here are some of the responsibilities of a solar project manager:  Planning: Create project schedules and budgets, and track ...

Drop Your CV

We will consider your Profile for future Jobs

Submit Profile