3 Opening(s)
12.0 Year(s) To 20.0 Year(s)
17.00 LPA TO 17.00 LPA
Elect Lead - AC/ DC + MV cable laying, ICOG/ IDT Erection + 33 kV TL Execution, Stringing + Outside boundary experience, Substation experience, 120 kV, 220 kV, 400 kV TL execution, Tower & Transmission line erection
Job description
This position exists to lead, manage, and support development of wind business in accordance ...
1 Opening(s)
9.0 Year(s) To 13.0 Year(s)
10.00 LPA TO 18.00 LPA
Job Title: Erection Lead – Wind Turbine Installation & CommissioningDesignation: Assistant Manager / Deputy ManagerLocation: Bhuj, GJDepartment: Wind Project ExecutionEducation: B.Tech in Mechanical EngineeringExperience Required: 9-13 years in wind turbine erection, installation, and commissioning
Job Purpose:
Lead and manage the complete installation and commissioning process of wind turbines for renewable energy projects. Ensure adherence to technical standards, project ...
1 Opening(s)
6.0 Year(s) To 10.0 Year(s)
14.00 LPA TO 24.00 LPA
Job Purpose
We are looking for an experienced Substation Design Engineer for our Renewable Energy Projects (ISTS/Captive) with 6-10 years of experience. The candidate will be responsible for the design and engineering of EHV Substations up to 400kV for solar and wind projects. The role requires a strong background in substation electrical design, detailed engineering, and collaboration with cross-functional teams to ...
2 Opening(s)
14.0 Year(s) To 20.0 Year(s)
30.00 LPA TO 40.00 LPA
Project Manager is responsible for the development, implementation, and coordination of solar energy systems. Their role is critical to ensuring that projects are completed safely, efficiently, and on time, while meeting quality standards and budget constraints.
Here are some of the responsibilities of project manager:
Planning: Create project schedules and budgets, and track goals, tasks, ...
1 Opening(s)
15.0 Year(s) To 25.0 Year(s)
30.00 LPA TO 50.00 LPA
Project Head / Manager is responsible for the development, implementation, and coordination of Wind energy systems. Their role is critical to ensuring that projects are completed safely, efficiently, and on time, while meeting quality standards and budget constraints.
Here are some of the responsibilities of a Wind project head/ manager:
Planning: Create project schedules and budgets, and ...
1 Opening(s)
10.0 Year(s) To 20.0 Year(s)
40.00 LPA TO 40.00 LPA
Project Manager is responsible for the development, implementation, and coordination of Wind energy systems. Their role is critical to ensuring that projects are completed safely, efficiently, and on time, while meeting quality standards and budget constraints.
Here are some of the responsibilities of a Wind project manager:
Planning: Create project schedules and budgets, and track goals, ...
2 Opening(s)
4.0 Year(s) To 12.0 Year(s)
6.00 LPA TO 15.00 LPA
Electrical Eng - Substation knowledge, 33 kV, BOP Installation, Transformer testing, SCADA is Preferred, Good coordination with contractors (Outside boundary experience is good to have like 120/ 220/ 400 kV TL, Stringing)
Project Execution experience for wind power plant
Checking inverters and Strings for faults and related. Rectifications, checking and rectification of defective strings ...
1 Opening(s)
18.0 Year(s) To 22.0 Year(s)
50.00 LPA TO 60.00 LPA
Key Responsibilities:
Lead and manage the project management team for solar and wind projects.
Oversee the installation and commissioning of projects, ensuring adherence to timelines and budgets.
Coordinate with site leads and ensure effective communication and reporting.
Develop and implement project management strategies and processes.
Ensure compliance with all regulatory and safety standards.
Manage stakeholder relationships, ...
2 Opening(s)
4.0 Year(s) To 12.0 Year(s)
6.00 LPA TO 15.00 LPA
Is B.Tech full time?
Project Planning: Developing erection plans, schedules, and methodologies for the installation of structures or equipment, considering project requirements and specifications
Supervision and Coordination: Overseeing the erection process, managing construction crews, subcontractors, and ensuring compliance with safety regulations and project timelines
Site Preparation: Collaborating with engineering teams to prepare the ...
2 Opening(s)
5.0 Year(s) To 13.0 Year(s)
20.00 LPA TO 29.00 LPA
Leading Wind Energy Company Looking out Lead Engineer, System Value Optimization-(S) New Products (Wind Turbine Loads/NPI/Simpack), Bangalore
Job Description Summary (4 Days work from Office)
The vision of the SVO- New Products team is to create robust yet cost-effective wind turbine product designs by providing best-in-class system value optimization, load assessment, validation, methods, and tools.As ...