Design is the 1st and most important work, which has to be carryout to kick, start any project. There are many challenges like customer not clear about solar capacity required, incomplete technical details from customer, not availability of land at time to prepare ...
1 Opening(s)
8.0 Year(s) To 12.0 Year(s)
12.00 LPA TO 15.00 LPA
Able to handle local issues properly
He should have experience of handling atleast 70 MW independently
Should have Solar Ground Mounted Exposure of min 10 Years through out.
Should have experience in Solar Tracker
Sungrow inverter
Solar O&M gound mounted experience should be 10 yrs
We need stability no frequent change
Unit SOLAR ...
1 Opening(s)
8.0 Year(s) To 12.0 Year(s)
12.00 LPA TO 15.00 LPA
Able to handle local issues properly
He should have experience of handling atleast 70 MW independently
Should have Solar Ground Mounted Exposure of min 10 Years through out.
Should have experience in Solar Tracker
Sungrow inverter
Solar O&M gound mounted experience should be 10 yrs
We need stability no frequent change
Unit SOLAR ...
2 Opening(s)
8.0 Year(s) To 12.0 Year(s)
12.00 LPA TO 15.00 LPA
It is a fixed tilt plant with 104 MW. Location is Jadi, GJ and Dhanera is the nearby city (15 kms away)able to handle local issues properly He should have experience of handling atleast 70 MW independently Should have Solar Ground Mounted Exposure of min 10 Years through out. Should ...
1 Opening(s)
15.0 Year(s) To 22.0 Year(s)
40.00 LPA TO 50.00 LPA
Job Title: Assistant General Manager/ Deputy General Manager – Project Manager (Solar)
Location: Head Office – MumbaiFunction: Projects – SolarExperience: 15–22 yearsReports To: Head – Solar Projects
Role Summary:
We are seeking a highly experienced and hands-on Project Manager (Solar) to lead end-to-end execution of utility-scale solar power projects across India. This strategic role is based at ...
1 Opening(s)
8.0 Year(s) To 12.0 Year(s)
8.00 LPA TO 14.00 LPA
A Solar Electrical Site Engineer JD involves managing on-site execution of solar PV projects, focusing on electrical aspects like cable laying, inverter/panel installation, testing (Megger, Earth Tester), ensuring quality and HSE compliance, coordinating with contractors, handling documentation (bill certification, progress reports), and liaising with authorities for grid/metering approvals, all while adhering to strict safety ...
1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
24.00 LPA TO 24.00 LPA
Position / Job Title (Proposed) Solar (AC): Electrical DesignDesignation Deputy ManagerFunction Engineering and TechnologyDepartment Engineering & TechnologyReporting To(Title)DGM/AVP- Engineering & Technology
Superior’s Superior(Title)VP- Engineering & Technology
Location Mumbai (HO)
Business Renewable Energy Business
1) Job Purpose
We are looking for Solar AC Design Engineer for Renewables Projects (ISTS/ Captive), who has expertise in Design & Engineering ...
2 Opening(s)
8.0 Year(s) To 12.0 Year(s)
12.00 LPA TO 15.00 LPA
It is a fixed tilt plant with 104 MW. Location is Jadi, GJ and Dhanera is the nearby city (15 kms away)able to handle local issues properly He should have experience of handling atleast 70 MW independently Should have Solar Ground Mounted Exposure of min 10 Years through out. Should ...
1 Opening(s)
8.0 Year(s) To 10.0 Year(s)
15.00 LPA TO 15.00 LPA
Electrical Engineer- Quality (SQA+FQA)
Experience: 8 – 10 years
Qualification: B.E/B.Tech (EEE)
Job Description:
Preparation of Pre-Bid Quality Requirements of Suppliers and Contractors.
Review of Pre bid information and provide joint Technical Evaluation Rating (TER) along with design. Communicate rating and order preference along with PO conditions if any to SCM team.
Preparation of SOP’s, Quality Manual, Formats and ...
2 Opening(s)
8.0 Year(s) To 12.0 Year(s)
12.00 LPA TO 15.00 LPA
Electrical- Testing & Commissioning Engineer
Protection system
Schemetic diagram
Logics
Relay scheme
Basic test
Testing & commissioning
Experience: 8 – 10 years
Qualification: B.E/B.Tech (Electrical) Job Description:
Studying and understanding the project contract specification. Planning and control the overall site commissioning activities to meet the commissioning deadline and project closure.