9 Job openings found

1 Opening(s)
6.0 Year(s) To 12.0 Year(s)
20.00 LPA TO 25.00 LPA
Securing CTU/STU grid connectivity Keeping close track of the planed/under construction/upcoming transmission schemes/status/schedules etc.Detail knowledge of different state connectivity process/guidelines/policies etc.Detail knowledge of substation and transmission line construction activities.Top on procedure/requirements/risks to lead entire process independently. Market Intelligence - Market intelligence of competitors presence /action plan in & around planned project area /substations.- ...
1 Opening(s)
25.0 Year(s) To 35.0 Year(s)
55.00 LPA TO 55.00 LPA
Managing the process of obtaining grid connectivity for renewable energy projects. This includes coordinating with various stakeholders, navigating regulatory frameworks, and ensuring compliance with technical specifications. The role requires a strong understanding of transmission infrastructure, renewable energy technologies, and project management principles.    Here's a more detailed breakdown of the job description: Key Responsibilities: Connectivity Application ...
1 Opening(s)
6.0 Year(s) To 8.0 Year(s)
18.00 LPA TO 20.00 LPA
1. Design and engineering of battery energy storage systems,ensuring compliance with industry standards and regulations.2. Perform technical analysis, including battery sizing, energymodelling, and system.3. Evaluate different battery technologies (e.g., lithium-ion,sodium-ion, flow batteries) for various applications.4. Preparation of Technical specification / Tender documents5. Conduct feasibility studies, site assessments, and systemperformance modelling6. ...
1 Opening(s)
6.0 Year(s) To 8.0 Year(s)
19.00 LPA TO 20.00 LPA
Sound Design knowledge of PV Plant design including DC SLD, PVarray layout designPV Plant Layouts Engineering– Equipment Plan and sectiondrawings, Inverter Stations, DC Earthing, Lightning Protection,Lighting, Cable Trays, Cable Trenches, Inverter TransformerArea, etc.Single Line diagram – Key DC SLD, Metering and Protection SLD,Auxiliary AC / DC system SLD.Design calculations – ...
1 Opening(s)
15.0 Year(s) To 20.0 Year(s)
55.00 LPA TO 60.00 LPA
Role Purpose The BESS Engineering team member will be responsible for the technical design, engineering, and integration of Battery Energy Storage Systems (BESS) across the company’s renewable energy portfolio. This role will drive technical due diligence, system architecture, vendor evaluation, detailed design, and support project execution from concept to commissioning, ensuring ...
1 Opening(s)
15.0 Year(s) To 18.0 Year(s)
50.00 LPA TO 50.00 LPA
Position / Job Title (Proposed) Lead – Grid Connectivity (CTU/STU/POSOCO/SLDC) Designation Senior General Manager / Asst. Vice President Function Project Development Department Grid Connectivity Reporting To (Title) Head Project Development Superior’s Superior (Title) CEO Location Mumbai Business Renewable Energy Business Job Context and Major Challenges   Seeing growing demand of RE power, extensive competition between RE developers to secure require grid connectivity in STU ...
1 Opening(s)
15.0 Year(s) To 20.0 Year(s)
50.00 LPA TO 55.00 LPA
Experience: 15+ years in EHV Substation & Transmission Lines-  EHV Line CTU/ STU permission and approvals, compliance and regulatory management within the renewable energy sector Mandatory areas of Domain Expertise. Substation Engg. (AIS/GIS) 400kV, 220kV, 132kV, 66kV, 33kVa. In-depth knowledge of design and detailing of EHV system for Renewables Projects. (Solar PV/ Wind/ EHV Substation).b. Preliminary design, ...
1 Opening(s)
12.0 Year(s) To 18.0 Year(s)
30.00 LPA TO 30.00 LPA
Job Description: Senior Manager – Compliance and Regulatory (Projects) Experience: 15+ years in compliance and regulatory management within the renewable energy sector Reporting To: Projects Head Key Responsibilities: Approvals and Clearances: Manage and secure all necessary approvals from state and central authorities, including:  DISCOMs, Transcos, CEIG, PTCC, Section 68, SLDC NOC, and synchronization approvals. Transmission line schedules, tower/pole ...
1 Opening(s)
6.0 Year(s) To 10.0 Year(s)
14.00 LPA TO 24.00 LPA
Job Purpose We are looking for an experienced Substation Design Engineer for our Renewable Energy Projects (ISTS/Captive) with 6-10 years of experience. The candidate will be responsible for the design and engineering of EHV Substations up to 400kV for solar and wind projects. The role requires a strong background in substation electrical design, detailed engineering, and collaboration with cross-functional teams to ...

Drop Your CV

We will consider your Profile for future Jobs

Submit Profile