1 Opening(s)
6.0 Year(s) To 12.0 Year(s)
7.00 LPA TO 12.00 LPA
1. Oversee all taxation matters (both Direct andIndirect taxes) for a media group, ensuring fullcompliance with the Goods and Services Tax (GST)Act and Income Tax Act.2. To draft, appear and represent before GST andIncome tax department and other tax authorities.3. Possess in-depth knowledge and practicalexperience in Direct Tax laws, including ...
1 Opening(s)
3.0 Year(s) To 6.0 Year(s)
3.00 LPA TO 5.00 LPA
CNC Turning Operations (Fanuc / Siemens / Haas controls) Aerospace-grade materials machining (Titanium, Inconel, Stainless Steel,Aluminum Alloys) G-code programming, offsets, and tool compensation Drawing reading, GD&T interpretation, and surface finish control Use of precision measurement tools (Micrometres, Vernier, Bore Gauges,Height Gauges, CMM) Process optimization and cycle time reduction Compliance ...
1 Opening(s)
10.0 Year(s) To 16.0 Year(s)
15.00 LPA TO 20.00 LPA
Job Summary:Enterprise NOC Lead based at Mumbai will oversee the end-to-end Enterprise operations of the Network Operations Center, ensuring high network availability, performance, and reliability for an ISP/Telecom company. This leadership role involves managing NOC staff, optimizing operational processes, and implementing best practices to minimize downtime and rapidly resolve network ...
1 Opening(s)
8.0 Year(s) To 12.0 Year(s)
12.00 LPA TO 15.00 LPA
Able to handle local issues properly
He should have experience of handling atleast 70 MW independently
Should have Solar Ground Mounted Exposure of min 10 Years through out.
Should have experience in Solar Tracker
Sungrow inverter
Solar O&M gound mounted experience should be 10 yrs
We need stability no frequent change
Unit SOLAR ...
1 Opening(s)
8.0 Year(s) To 12.0 Year(s)
12.00 LPA TO 15.00 LPA
Able to handle local issues properly
He should have experience of handling atleast 70 MW independently
Should have Solar Ground Mounted Exposure of min 10 Years through out.
Should have experience in Solar Tracker
Sungrow inverter
Solar O&M gound mounted experience should be 10 yrs
We need stability no frequent change
Unit SOLAR ...
1 Opening(s)
4.0 Year(s) To 7.0 Year(s)
16.00 LPA TO 16.00 LPA
Job Description – AM- Supply Chain Management (Solar & Wind Projects)Job Title: Assistant Manager– Supply Chain ManagementDepartment: SCM – Projects (Solar & Wind)Location: [BKC/Project Sites as applicable]Reports to: Manager – SCM
Role SummaryThe AM – SCM will support the SCM Manager and project teams in finalizing material requirements, coordinating with vendors, and tracking deliveries ...
1 Opening(s)
7.0 Year(s) To 13.0 Year(s)
18.00 LPA TO 18.00 LPA
Job Description – Manager, SCM (Solar & Wind Projects)Job Title: Manager – Supply Chain ManagementDepartment: SCM – Projects (Solar & Wind)Location: [BKC/Project Sites as applicable]Reports to: Head – SCM
Role SummaryThe SCM Manager will act as the key link between the Project, Engineering, Quality, and Procurement teams to ensure timely availability of ...
1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
45.00 LPA TO 50.00 LPA
The Solar Lead will be responsible for overseeing all aspects of large-scale solar projects, from initial development and planning to installation, commissioning, and operations. This role will involve leading technical teams, managing project budgets and schedules, ensuring regulatory compliance, and driving the successful and safe delivery of ArcelorMittal's green energy ...
2 Opening(s)
13.0 Year(s) To 16.0 Year(s)
20.00 LPA TO 20.00 LPA
Business Solar business
1) Job Purpose: Write the purpose for which the job exists
The Solar Power Plant Manager is responsible for maximizing revenue generation and minimizing operational losses and costs by overseeing efficient Operation & Maintenance and Asset Management ofthe Solar power plant. This role ensures regulatory compliance and smooth coordination with ...
2 Opening(s)
8.0 Year(s) To 12.0 Year(s)
12.00 LPA TO 15.00 LPA
It is a fixed tilt plant with 104 MW. Location is Jadi, GJ and Dhanera is the nearby city (15 kms away)able to handle local issues properly He should have experience of handling atleast 70 MW independently Should have Solar Ground Mounted Exposure of min 10 Years through out. Should ...