1 Opening(s)
6.0 Year(s) To 12.0 Year(s)
12.00 LPA TO 13.00 LPA
Able to handle local issues properly
He should have experience of handling atleast 70 MW independently
Should have Solar Ground Mounted Exposure of min 10 Years through out.
Should have experience in Solar Tracker
Sungrow inverter
Solar O&M gound mounted experience should be 10 yrs
We need stability no frequent change
Unit SOLAR ...
1 Opening(s)
6.0 Year(s) To 12.0 Year(s)
12.00 LPA TO 13.00 LPA
Able to handle local issues properly
He should have experience of handling atleast 70 MW independently
Should have Solar Ground Mounted Exposure of min 10 Years through out.
Should have experience in Solar Tracker
Sungrow inverter
Solar O&M gound mounted experience should be 10 yrs
We need stability no frequent change
Unit SOLAR ...
1 Opening(s)
8.0 Year(s) To 12.0 Year(s)
12.00 LPA TO 15.00 LPA
Able to handle local issues properly
He should have experience of handling atleast 70 MW independently
Should have Solar Ground Mounted Exposure of min 10 Years through out.
Should have experience in Solar Tracker
Sungrow inverter
Solar O&M gound mounted experience should be 10 yrs
We need stability no frequent change
Unit SOLAR ...
1 Opening(s)
8.0 Year(s) To 12.0 Year(s)
12.00 LPA TO 15.00 LPA
Able to handle local issues properly
He should have experience of handling atleast 70 MW independently
Should have Solar Ground Mounted Exposure of min 10 Years through out.
Should have experience in Solar Tracker
Sungrow inverter
Solar O&M gound mounted experience should be 10 yrs
We need stability no frequent change
Unit SOLAR ...
2 Opening(s)
8.0 Year(s) To 12.0 Year(s)
12.00 LPA TO 15.00 LPA
It is a fixed tilt plant with 104 MW. Location is Jadi, GJ and Dhanera is the nearby city (15 kms away)able to handle local issues properly He should have experience of handling atleast 70 MW independently Should have Solar Ground Mounted Exposure of min 10 Years through out. Should ...
2 Opening(s)
8.0 Year(s) To 12.0 Year(s)
12.00 LPA TO 15.00 LPA
It is a fixed tilt plant with 104 MW. Location is Jadi, GJ and Dhanera is the nearby city (15 kms away)able to handle local issues properly He should have experience of handling atleast 70 MW independently Should have Solar Ground Mounted Exposure of min 10 Years through out. Should ...
1 Opening(s)
10.0 Year(s) To 12.0 Year(s)
28.00 LPA TO 28.00 LPA
Job Description Solar Resource and Performance analysis Role Proposal Stage Yield Assessment
a. Solar Resource Assessment covering comparison with nearby plants, aerosol/pollution study and climate studyb. Energy yield assessment for solar projects and solar part in hybrid projectsc. TL line loss assessment, Tilt-Pitch analysis, Tracker Vs Fixed Tilt analysisd. Maintaining the Solar resource database ...
1 Opening(s)
13.0 Year(s) To 16.0 Year(s)
30.00 LPA TO 35.00 LPA
Location: Head Office – MumbaiFunction: Projects – SolarReports To: Head – Solar Projects
Role Summary:
We are seeking a highly experienced and hands-on Project Manager (Solar) to lead end-to-end execution of utility-scale solar power projects across India. This strategic role is based at Mumbai HO, with frequent travel to project sites during critical phases. The ...
1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
24.00 LPA TO 24.00 LPA
Position / Job Title (Proposed) Solar (AC): Electrical DesignDesignation Deputy ManagerFunction Engineering and TechnologyDepartment Engineering & TechnologyReporting To(Title)DGM/AVP- Engineering & Technology
Superior’s Superior(Title)VP- Engineering & Technology
Location Mumbai (HO)
Business Renewable Energy Business
1) Job Purpose
We are looking for Solar AC Design Engineer for Renewables Projects (ISTS/ Captive), who has expertise in Design & Engineering ...
1 Opening(s)
10.0 Year(s) To 12.0 Year(s)
10.00 LPA TO 12.00 LPA
A Store Manager overseeing solar projects has a range of responsibilities that ensure smooth operations, efficient inventory management, and effective sales execution. Below are the key responsibilities:
1. Store Operations Management
Ensure the store is well-organized and fully stocked with solar equipment (panels, inverters, batteries, charge controllers, etc.).
Implement standard operating procedures (SOPs) ...