1 Opening(s)
8.0 Year(s) To 10.0 Year(s)
14.00 LPA TO 24.00 LPA
Job Description Solar Resource and Performance analysis Role Proposal Stage Yield Assessment
a. Solar Resource Assessment covering comparison with nearby plants, aerosol/pollution study and climate studyb. Energy yield assessment for solar projects and solar part in hybrid projectsc. TL line loss assessment, Tilt-Pitch analysis, Tracker Vs Fixed Tilt analysisd. Maintaining the Solar resource database ...
1 Opening(s)
6.0 Year(s) To 10.0 Year(s)
14.00 LPA TO 24.00 LPA
Job Purpose
We are looking for Design Civil Lead for Renewables project (Solar & Wind) who has expertise in Design & Engineering of civil & structural works (experience of 10 – 14 yrs. in Solar/Wind/ ISTS projects)
Key Responsibilities
Accountability Supporting Actions Leadership Team
Management
Lead and mentor a team of civil engineers, providing guidance and fostering ...
1 Opening(s)
6.0 Year(s) To 10.0 Year(s)
14.00 LPA TO 24.00 LPA
Job Purpose
We are looking for an experienced Substation Design Engineer for our Renewable Energy Projects (ISTS/Captive) with 6-10 years of experience. The candidate will be responsible for the design and engineering of EHV Substations up to 400kV for solar and wind projects. The role requires a strong background in substation electrical design, detailed engineering, and collaboration with cross-functional teams to ...