1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
12.00 LPA TO 15.00 LPA
Mandatory Requirements
Education: Must be a Diploma in Industrial Safety from a recognized board/university.
Location: Fatehgarh, Jamjodhpur,Nalia
Experience: Must have minimum 10 to 15 years of project experience in Wind EPC project
Safety Manager/ Deputy Manager is responsible for ensuring all health, safety, and environmental regulations and guidelines are met at the solar project site. This role involves identifying ...
2 Opening(s)
12.0 Year(s) To 18.0 Year(s)
17.00 LPA TO 17.00 LPA
Elect Lead - AC/ DC + MV cable laying, ICOG/ IDT Erection + 33 kV TL Execution, Stringing + Outside boundary experience, Substation experience, 120 kV, 220 kV, 400 kV TL execution, Tower & Transmission line erection
Job description
This position exists to lead, manage, and support development of solar business in ...
1 Opening(s)
12.0 Year(s) To 18.0 Year(s)
18.00 LPA TO 24.00 LPA
Elect Lead - AC/ DC + MV cable laying, ICOG/ IDT Erection + 33 kV TL Execution, Stringing + Outside boundary experience, Substation experience, 120 kV, 220 kV, 400 kV TL execution, Tower & Transmission line erection
Job description
This position exists to lead, manage, and support development of solar business in ...
1 Opening(s)
10.0 Year(s) To 12.0 Year(s)
28.00 LPA TO 28.00 LPA
Job Description Solar Resource and Performance analysis Role Proposal Stage Yield Assessment
a. Solar Resource Assessment covering comparison with nearby plants, aerosol/pollution study and climate studyb. Energy yield assessment for solar projects and solar part in hybrid projectsc. TL line loss assessment, Tilt-Pitch analysis, Tracker Vs Fixed Tilt analysisd. Maintaining the Solar resource database ...
1 Opening(s)
10.0 Year(s) To 12.0 Year(s)
10.00 LPA TO 12.00 LPA
A Store Manager overseeing solar projects has a range of responsibilities that ensure smooth operations, efficient inventory management, and effective sales execution. Below are the key responsibilities:
1. Store Operations Management
Ensure the store is well-organized and fully stocked with solar equipment (panels, inverters, batteries, charge controllers, etc.).
Implement standard operating procedures (SOPs) ...
2 Opening(s)
10.0 Year(s) To 20.0 Year(s)
14.00 LPA TO 24.00 LPA
Civil Lead - Boundary survey, Fencing work, Grading, Levelling, Piling & ICR, 33 kV TL foundation work + Substation and Bay area foundation, 120 kV + foundation experience
PRINCIPAL ACCOUNTABILITIES Accountabilities Major Activities
Drive the qualification of identified new business opportunities in the solar power projects and solar dominated wind -solar hybrid ...
1 Opening(s)
18.0 Year(s) To 20.0 Year(s)
50.00 LPA TO 60.00 LPA
Position / Job Title (Proposed) Project Solar HeadDesignation DGM/GMFunction Projects Department SolarReporting To (Title) Projects Head
Location Mumbai (HO)Business Renewable Energy Business
1: The primary objective is to ensure the successful execution of Solar projects from start to Finish & will be responsible for the quality of work, and for keeping a project on time and ...
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
15.00 LPA TO 15.00 LPA
Project Product Electrical Engineer
Location: Chennai
Band: Professional
Business: Solar & Storage Solution
Exp: 5+ yrs
Education: Engineering Degree in EEE or Electrical is must.( Avoid Diploma or Part time Education), MTech preferred.
Role – Individual Contributor
Travel to Plant – 10-15%
Who We Are
Solar and Storage Solutions provides reliable, affordable and dispatchable integration of renewable energies. The business ...
1 Opening(s)
6.0 Year(s) To 10.0 Year(s)
14.00 LPA TO 24.00 LPA
Job Purpose
We are looking for Design Civil Lead for Renewables project (Solar & Wind) who has expertise in Design & Engineering of civil & structural works (experience of 10 – 14 yrs. in Solar/Wind/ ISTS projects)
Key Responsibilities
Accountability Supporting Actions Leadership Team
Management
Lead and mentor a team of civil engineers, providing guidance and fostering ...
1 Opening(s)
8.0 Year(s) To 12.0 Year(s)
20.00 LPA TO 20.00 LPA
Site Assessment & Preparation - Evaluate site conditions, Coordinate geotechnical and hydrological studies
Evaluate foundation options for solar panel mounting structures (e.g., driven piles, ground screws, concrete foundations)
Perform soil testing and analysis
Re-Engineering of Wind Turbine Generator(WTG) Foundation as per Site Specific condition
SOP for Pile Load Test as per IS 2911 with ...