110 Job openings found

1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
30.00 LPA TO 30.00 LPA
Job Description: Forecasting and Scheduling Lead (Manager / Sr. Manager – O and M) Job Purpose The Forecasting & Scheduling Lead is responsible for ensuring accurate forecasting, scheduling data integrity, and DSM performance optimization across Solar and Wind assets. The role drives analysis ofdeviations, minimization of DSM liabilities, and regulatory compliance, while enabling informed operational and ...
1 Opening(s)
15.0 Year(s) To 20.0 Year(s)
40.00 LPA TO 40.00 LPA
Principal Accountability/ Key ResultGeneration & Revenue - Ensure system availability through effective preventive, breakdown, and predictive maintenance of HV/EHV assets.- Track KPIs, grid conditions, and asset health to minimize downtime and improve MTBF/MTTR.- Drive condition monitoring (thermal, oil, relay, PD/IR) and use diagnostic tools.- Lead RCA, PFMEA, and corrective actions to prevent repeat issues and ...
4 Opening(s)
8.0 Year(s) To 12.0 Year(s)
12.00 LPA TO 14.00 LPA
Job Purpose:The O&M Site In-Charge will be responsible for managing the day-to-day operations, maintenance, and performance optimization of solar power plants in Karnataka. The role ensures plant availability, reliability, and compliance with safety and quality standards. Key Responsibilities: Operations Management: Oversee daily operations of solar PV plants to ensure optimal performance. Monitor SCADA systems, ...
1 Opening(s)
13.0 Year(s) To 18.0 Year(s)
24.00 LPA TO 25.00 LPA
Key Responsibilities: PAN-India O&M Safety Governance Lead EHS oversight for all O&M solar and wind sites across India. Ensure consistent implementation of O&M safety standards, systems, and SOPs across sites. Act as the central SPOC for O&M safety governance from HO. MIS, Analytics & Reporting Develop and manage EHS MIS dashboards for O&M operations. Analyze safety data, incidents, near misses, ...
1 Opening(s)
15.0 Year(s) To 20.0 Year(s)
50.00 LPA TO 55.00 LPA
Experience: 15+ years in EHV Substation & Transmission Lines-  EHV Line CTU/ STU permission and approvals, compliance and regulatory management within the renewable energy sector Mandatory areas of Domain Expertise. Substation Engg. (AIS/GIS) 400kV, 220kV, 132kV, 66kV, 33kVa. In-depth knowledge of design and detailing of EHV system for Renewables Projects. (Solar PV/ Wind/ EHV Substation).b. Preliminary design, ...
1 Opening(s)
6.0 Year(s) To 10.0 Year(s)
14.00 LPA TO 24.00 LPA
Job Purpose We are looking for an experienced Substation Design Engineer for our Renewable Energy Projects (ISTS/Captive) with 6-10 years of experience. The candidate will be responsible for the design and engineering of EHV Substations up to 400kV for solar and wind projects. The role requires a strong background in substation electrical design, detailed engineering, and collaboration with cross-functional teams to ...
2 Opening(s)
6.0 Year(s) To 20.0 Year(s)
15.00 LPA TO 40.00 LPA
Project Manager is responsible for the development, implementation, and coordination of solar energy systems. Their role is critical to ensuring that projects are completed safely, efficiently, and on time, while meeting quality standards and budget constraints.  Here are some of the responsibilities of a solar project manager:  Planning: Create project schedules and budgets, and track ...
1 Opening(s)
7.0 Year(s) To 12.0 Year(s)
12.00 LPA TO 15.00 LPA
Reports To: Lead – Land Acquisition Experience: 7+ years (Experience in Renewable Energy Sector) 1) Job Purpose: To manage and oversee land acquisition activities for renewable energy projects , particularly in the region. The role involves identifying suitable land parcels, ensuring compliance with regulatory requirements, and liaising with key stakeholders to facilitate the acquisition process ...
1 Opening(s)
3.0 Year(s) To 7.0 Year(s)
24.00 LPA TO 24.00 LPA
Job Purpose Job Purpose Description Job Context & Major Challenges Design is the 1st and most important work, which has to be carryout to kick, start any project. There are many challenges like customer not clear about solar capacity required, incomplete technical details from customer, not availability of land at time to prepare ...
1 Opening(s)
7.0 Year(s) To 12.0 Year(s)
12.00 LPA TO 15.00 LPA
Reports To: Lead – Land Acquisition Experience: 7+ years (Experience in Renewable Energy Sector) 1) Job Purpose: To manage and oversee land acquisition activities for renewable energy projects , particularly in the region. The role involves identifying suitable land parcels, ensuring compliance with regulatory requirements, and liaising with key stakeholders to facilitate the acquisition process ...

Drop Your CV

We will consider your Profile for future Jobs

Submit Profile