1 Opening(s)
25.0 Year(s) To 35.0 Year(s)
55.00 LPA TO 55.00 LPA
Managing the process of obtaining grid connectivity for renewable energy projects. This includes coordinating with various stakeholders, navigating regulatory frameworks, and ensuring compliance with technical specifications. The role requires a strong understanding of transmission infrastructure, renewable energy technologies, and project management principles.
Here's a more detailed breakdown of the job description:
Key Responsibilities:
Connectivity Application ...
1 Opening(s)
15.0 Year(s) To 20.0 Year(s)
50.00 LPA TO 55.00 LPA
Experience: 15+ years in EHV Substation & Transmission Lines- EHV Line CTU/ STU permission and approvals, compliance and regulatory management within the renewable energy sector
Mandatory areas of Domain Expertise.
Substation Engg. (AIS/GIS) 400kV, 220kV, 132kV, 66kV, 33kVa. In-depth knowledge of design and detailing of EHV system for Renewables Projects. (Solar PV/ Wind/ EHV Substation).b. Preliminary design, ...
1 Opening(s)
6.0 Year(s) To 12.0 Year(s)
20.00 LPA TO 25.00 LPA
Securing CTU/STU grid connectivity
Keeping close track of the planed/under construction/upcoming transmission schemes/status/schedules etc.Detail knowledge of different state connectivity process/guidelines/policies etc.Detail knowledge of substation and transmission line construction activities.Top on procedure/requirements/risks to lead entire process independently.
Market Intelligence
- Market intelligence of competitors presence /action plan in & around planned project area /substations.- ...
1 Opening(s)
15.0 Year(s) To 18.0 Year(s)
50.00 LPA TO 50.00 LPA
Position / Job Title (Proposed) Lead – Grid Connectivity (CTU/STU/POSOCO/SLDC)
Designation Senior General Manager / Asst. Vice President
Function Project Development
Department Grid Connectivity
Reporting To (Title) Head Project Development
Superior’s Superior (Title) CEO
Location Mumbai
Business Renewable Energy Business
Job Context and Major Challenges
Seeing growing demand of RE power, extensive competition between RE developers to secure require grid connectivity in STU ...
1 Opening(s)
15.0 Year(s) To 25.0 Year(s)
30.00 LPA TO 45.00 LPA
Experience: 15+ years in EHV Substation & Transmission Lines- EHV Line CTU/ STU permission and approvals, compliance and regulatory management within the renewable energy sector
Reporting To: Projects Head
Key Responsibilities:
Approvals and Clearances:
Manage and secure all necessary approvals from state and central authorities, including:
Approval Management: • Oversee the process of obtaining all necessary approvals for construction, installation, ...
1 Opening(s)
8.0 Year(s) To 12.0 Year(s)
15.00 LPA TO 18.00 LPA
Mechanical Engineer- Quality (SQA+FQA)
Experience: 8 – 10 years
Qualification: B.E/B.Tech (Mechanical)
Job Description:
Preparation of Pre-Bid Quality Requirements of Suppliers & Contractors.
Review of Prebid information and provide joint Technical Evaluation Rating (TER)
along with design. Communicate rating and order preference along with PO conditions if any to SCM team.
Preparation of SOP’s, Quality Manual, Formats and ...
1 Opening(s)
12.0 Year(s) To 20.0 Year(s)
18.00 LPA TO 24.00 LPA
Elect Lead - AC/ DC + MV cable laying, ICOG/ IDT Erection + 33 kV TL Execution, Stringing + Outside boundary experience, Substation experience, 120 kV, 220 kV, 400 kV TL execution, Tower & Transmission line erection
Job description
This position exists to lead, manage, and support development of wind business in accordance ...
1 Opening(s)
12.0 Year(s) To 20.0 Year(s)
18.00 LPA TO 24.00 LPA
Elect Lead - AC/ DC + MV cable laying, ICOG/ IDT Erection + 33 kV TL Execution, Stringing + Outside boundary experience, Substation experience, 120 kV, 220 kV, 400 kV TL execution, Tower & Transmission line erection
Job description
This position exists to lead, manage, and support development of wind business in accordance ...
2 Opening(s)
12.0 Year(s) To 18.0 Year(s)
17.00 LPA TO 17.00 LPA
Elect Lead - AC/ DC + MV cable laying, ICOG/ IDT Erection + 33 kV TL Execution, Stringing + Outside boundary experience, Substation experience, 120 kV, 220 kV, 400 kV TL execution, Tower & Transmission line erection
Job description
This position exists to lead, manage, and support development of solar business in ...
1 Opening(s)
12.0 Year(s) To 18.0 Year(s)
30.00 LPA TO 30.00 LPA
Job Description: Senior Manager – Compliance and Regulatory (Projects)
Experience: 15+ years in compliance and regulatory management within the renewable energy sector
Reporting To: Projects Head
Key Responsibilities:
Approvals and Clearances:
Manage and secure all necessary approvals from state and central authorities, including:
DISCOMs, Transcos, CEIG, PTCC, Section 68, SLDC NOC, and synchronization approvals. Transmission line schedules, tower/pole ...