1 Opening(s)
4.0 Year(s) To 8.0 Year(s)
5.00 LPA TO 5.00 LPA
Installation, Testing, Commissioning, Maintenance & Troubleshooting-
Preventive, Predictive, Target Base and Break down Maintenance planning and activities.
Responsible for Power Saving Jobs, Projects, Modification Works.
Adhere to POKA-YOKE, 5S, documentation.
Carrying out Why-Why/Root-Cause/Break Down analysis.
Attending breakdown related machine in high voltage & low voltage power cable industry such as VCV line, RBD, 91 Bobbin ...
2 Opening(s)
5.0 Year(s) To 12.0 Year(s)
20.00 LPA TO 35.00 LPA
The Staff Engineer – Controls” activities include contributing to the design, development, troubleshooting, and verification of open and closed loop control systems for products, solutions and systems for the Aviation power industry. Includes activities linked to technical improvement of existing products and components. Impacts approaches, projects and programs in the ...